Inverter Commissioning
Your inverter was installed. But was it actually programmed?
A surprisingly large number of inverters in Uganda run on factory defaults — wrong charge voltages, wrong cut-offs, wrong battery chemistry settings. This kills batteries, voids warranties, and wastes your investment. We programme every parameter correctly and give you a written settings sheet.
What we configure
Every parameter matched to your battery and usage
We don't use generic presets. Each setting is calculated from your battery manufacturer's datasheet and your actual power usage pattern.
Bulk / absorption / float charge voltages (matched to battery chemistry)
Low-voltage cut-off and reconnect thresholds
Maximum charge current limits
AC input voltage range and frequency
Output source priority (solar / battery / grid)
Generator start/stop voltage thresholds
Generator charging current limit
MPPT string voltage window verification
Time-of-use scheduling (where supported)
Parallel / phase configuration (multi-inverter systems)
Brands we commission
All major inverter brands used in Uganda
Whether you have a Deye, Victron, Luminous, Growatt, Must, Kodak, Mecer, or Felicity — we know the firmware, the menus, and the settings that matter.
Deye
Hybrid & off-grid
Victron
MultiPlus & EasySolar
Growatt
SPF & MIN series
Luminous
Cruze & NXG series
What you receive
A written settings sheet — not just a verbal handover
Most buyers in Uganda can't verify what settings their inverter is running. We change that. You get a document showing every parameter we configured, why, and what to check if something changes.
Your settings sheet includes:
- 01 Inverter make, model, and firmware version
- 02 Battery type, capacity, and chemistry confirmed
- 03 Every charge parameter with value and reason
- 04 Output priority and generator interaction settings
- 05 PV string configuration and MPPT verification
- 06 Date, technician name, and contact for follow-up