What we do

Engineering-led solar services across Uganda

Uganda's power grid is in crisis — 74% of firms report surging interruptions, and the solar market is full of abandoned installations and counterfeit equipment. We cover the full project lifecycle with one difference: every job is documented, every system is tested before handover, and we answer the phone after payment.

Our services

Everything your power system needs

Residential, commercial, agricultural, industrial. We work across system sizes and sectors.

Solar Installation

Most solar failures start at installation — wrong sizing, poor earthing, inverters left on factory defaults. We do load analysis first, then design a system that matches your actual usage. Properly grounded, correctly configured, and documented before we leave.

  • Load and site assessment
  • Panel, battery and inverter selection
  • Structural and electrical installation
  • Earthing, bonding and protection
  • Commissioning and handover documentation
Get an Installation Quote →

Repair & Troubleshooting

An estimated 75% of solar systems across Africa have stopped working — most from configuration errors, not hardware failure. We diagnose the root cause, give you a written fault report, and fix the actual problem. Including systems installed by other companies.

  • Root-cause diagnostic process
  • Written fault report
  • Inverter settings correction
  • Battery testing and replacement
  • Earthing fault diagnosis
Learn About Diagnostics →

Inverter Commissioning

A surprisingly large number of inverters in Uganda run on factory defaults — wrong charge voltages, wrong cut-offs, wrong generator priority. This kills batteries and voids warranties. We programme every parameter to your specific battery chemistry and usage pattern, and hand you a written settings sheet.

  • All major brands: Deye, Victron, Luminous, Growatt
  • Battery chemistry-specific settings
  • Generator ATS configuration
  • Written settings sheet on completion
View Commissioning Service →

Maintenance Contracts

After-sales abandonment is the #1 complaint in Uganda's solar market. Our maintenance contracts are the opposite: scheduled inspections, battery health checks, inverter parameter reviews, and priority fault response — on a fixed-fee contract so your system doesn't silently degrade.

  • Quarterly or bi-annual visits
  • Panel cleaning and mounting inspection
  • Battery voltage and SoC logging
  • Inverter performance report
  • Priority response on faults
View Maintenance Plans →

Commercial & Industrial Systems

Ugandan manufacturers report 4–15 power interruptions per day and UGX 30M+ monthly in generator fuel. We deliver 15 kVA+ 3-phase hybrid systems with full as-built drawings, commissioning certificates, and maintenance SLAs — the documentation your insurer, auditor, and board actually need.

  • Energy audit and load profiling
  • 3-phase inverter design and install
  • Generator ATS integration
  • As-built drawings and commissioning report
  • Maintenance contract included
View C&I Solutions →

Technical Assessments

Buying a property with an existing solar system? Inheriting a poorly installed system? We provide independent technical assessments with a written condition report.

  • Full system audit and inspection
  • Battery health testing
  • Earthing and protection check
  • Inverter settings review
  • Remediation recommendations
Book an Assessment →

How we work

Every project starts with understanding your load

Information asymmetry is the biggest problem in Uganda's solar market — buyers can't verify sizing, settings, or equipment quality. Our process eliminates that gap: you see what we measured, why we chose each component, and what settings we programmed.

Start with a Quote →
  1. 01
    Site Assessment

    We visit the site, measure your load, assess roof or ground space, and understand how you use power across the day. No assumption-based quotes.

  2. 02
    System Design & Quote

    You receive an itemised quote with specific equipment, quantities, and explanation. Equipment is selected for performance and long-term reliability — not margin.

  3. 03
    Installation

    Clean cable management, correct earthing, proper terminations. Not just functional — safe and inspectable. We photograph every stage.

  4. 04
    Commissioning & Handover

    Every inverter is programmed on-site. You receive a written settings sheet and system handover document. We test under load before we leave.

Get started

Ready to discuss your power needs?

You'll get an itemised quote with specific equipment, a clear explanation of why we chose it, and a response within 24 hours. No pressure, no inflated numbers, no disappearing act.