Our Work

Real installations. Real clients. Documented workmanship.

Every system we install is engineered to the client's actual load, commissioned under test, and handed over with a written settings report. These are systems we designed, installed, and continue to support — across homes, clinics, NGOs, farms, and commercial sites in Uganda.

Project Portfolio

Clinic solar system 6kVA hybrid with 15kWh battery bank for cold chain protection
Clinic

Clinic Cold-Chain Hybrid

Central Uganda · Clinic client

  • 6kVA hybrid inverter
  • 15kWh lithium bank
  • Dedicated vaccine refrigerator circuit
  • Critical-load isolation & labelling

Zero cold-chain loss since commissioning. No generator needed to hold fridge temperatures through outages.

Kijani Forestry Gulu 12kVA 20kWh solar system by NilePhase Energy
Institutional

Kijani Forestry · Gulu

Gulu · Northern Uganda

  • 12kVA hybrid inverter
  • 20kWh lithium battery bank
  • Field office & seedling facility
  • Remote-monitoring enabled

Full autonomy for a remote-site operation. Commissioned and monitored from Kampala.

20kVA 40kWh commercial solar hybrid system by NilePhase Energy
Commercial

20kVA · 40kWh C&I Hybrid

Industrial Area · Kampala

  • 20kVA 3-phase hybrid inverter
  • 40kWh lithium storage
  • Large critical-load facility
  • As-built drawings & maintenance SLA

Generator runtime reduced by over 70%. Full as-built documentation delivered for audit compliance.

10kVA solar system with 30kWh battery storage installed in Uganda
Residential

10kVA · 30kWh Large Home

Entebbe · Wakiso

  • 10kVA hybrid inverter
  • 30kWh lithium storage
  • Whole-home coverage including AC
  • Grounding verified & protection installed

Full-home backup with multi-day autonomy. Commissioned with measured load profile — not brochure numbers.

12kVA business hybrid system with 15kWh battery storage Uganda
Commercial

12kVA Business Hybrid

Kampala

  • 12kVA hybrid inverter
  • 15kWh lithium battery bank
  • POS, lighting, cooling & server rack
  • Generator integration with ATS

Business stays fully operational through outages. Fuel spend cut sharply and generator now runs only as last-resort backup.

Commercial and industrial solar project by NilePhase Energy
Commercial

C&I Facility Installation

Central Region

  • 3-phase hybrid topology
  • Parallel inverter configuration
  • Structured trunking & labelling throughout
  • Commissioning & protection audit

Clean, audit-ready C&I installation. Handed over with full settings book and as-built drawings.

18kVA commercial solar system with 40kWh battery bank
Commercial

18kVA · 40kWh Commercial

Greater Kampala

  • 18kVA 3-phase hybrid
  • 40kWh lithium storage
  • Critical load segregation & labelling
  • Remote monitoring & logged settings

Significant fuel reduction and uninterrupted operating hours. Delivered with full commissioning and settings documentation.

4kVA home hybrid solar installation by NilePhase Energy
Residential

4kVA Home Backup System

Kampala · Central Region

  • 4kVA hybrid inverter
  • 2.5kWh lithium battery
  • Essentials circuit (lights, router, fridge)
  • Settings sheet & handover documentation

Homeowner keeps power through Yaka outages without starting a generator. Clean trunking and a neat DB layout.

6kVA hybrid inverter with 10kWh lithium battery bank installed by NilePhase Energy
Residential

6kVA · 10kWh Home Hybrid

Wakiso District

  • 6kVA hybrid inverter
  • 10kWh lithium battery bank
  • Whole-house backup excluding water heater
  • Full commissioning report

8+ hours backup through evening load. Yaka spend reduced by over 60%.

NGO 12kVA solar system with 20kWh battery storage
Institutional

NGO Field Office · 12kVA Hybrid

Central Region

  • 12kVA 3-phase hybrid inverter
  • 20kWh lithium storage
  • Office, IT room & residential block
  • Full as-built drawings delivered

Replaced an aging diesel setup. Reduced fuel costs and noise while keeping mission-critical IT online.

3HP solar water pumping system for agricultural borehole Uganda
Agricultural

3HP Solar Water Pumping

Rural Uganda · Borehole site

  • 3HP solar pump controller
  • Borehole submersible pump
  • Elevated storage tank feed
  • Direct solar drive — no battery required

Eliminated diesel pump costs. Reliable daily water yield for livestock and irrigation.

Solar water heater installation by NilePhase Energy
Residential

Solar Water Heating

Kampala

  • Pressurised solar thermal system
  • Insulated storage tank
  • Rooftop collector with back-up element
  • Plumbed into main hot-water line

Eliminated electric geyser load — often the single biggest hidden cost on a Ugandan household's power bill.

How We Work

Every project follows the same standard

We don't cut corners because a system is "small." Every installation — residential or commercial — gets the same engineering discipline.

Site assessment first

We measure your actual load, inspect your roof or ground space, and audit your existing electrical setup before quoting. No assumptions.

Engineered to your load

System sizing is calculated — not guessed from a brochure. Panels, batteries, and inverter capacity match your real consumption and usage pattern.

Commissioned and documented

Every system is commissioned with correct inverter settings, tested under load, and handed over with a written settings report, grounding confirmation, and equipment list.

Have a project in mind?

Tell us about your power needs. We'll come back with a site-specific proposal — not a generic price list.